St. Croix River bridge inspection underway; delays expected

14.07.2025    Pioneer Press    1 views
St. Croix River bridge inspection underway; delays expected

Motorists using the St Croix River bridge south of Stillwater will encounter single-lane closures this week as the bridge undergoes inspection by Wisconsin Department of Transportation engineers From now until Thursday daily lane closures will occur between a m and p m for eastbound traffic and between a m and p m for westbound traffic according to WisDOT representatives Motorists might experience delays and should plan accordingly The bridge which opened to traffic in August is inspected every two years Related Articles What to expect at Lumberjack Days What makes a club win things a Woodbury podcaster learned from local leaders After nearly years a retiring local fire chief shares tips and tales Strike to end Saturday for medical care workers at Stillwater clinic issues not resolved Man charged with trafficking -year-old in Mahtomedi another man accused of sexually assaulting her

Similar News

25-year-old motorcyclist killed in crash with SUV
25-year-old motorcyclist killed in crash with SUV in Walpole

The crash remains under investigation. The post 25-year-old motorcyclist killed in crash with SUV in...

15.07.2025 0
Read More
‘Natural organic reduction,’ or human composting, now burial option in MN
‘Natural organic reduction,’ or human composting, now burial option in MN

Minnesotans will soon no longer need to leave the state to return their remains to nature by convert...

15.07.2025 0
Read More
Illinois firefighters join disaster response in Texas
Illinois firefighters join disaster response in Texas

A team of Illinois firefighters has begun working search-and-rescue missions in flood-ravaged Texas ...

15.07.2025 0
Read More